Feroterm btc

Mala Darila‎‎, Tinkula, - spletna parfumerija, Fero-Term Slovenija, Odeja, Dankuchen BTC City, , Marko Juhant, GA+kuhinje, Za starše.
Table of contents

Inner ridge mask Pos. Sealing tape made of foamed polyethylene or foamed PVC 3 x 15 mm Pos. Gradually, Trimoterm SNV panels are placed and screwed on the left and right side. On panel edge the top sheet metal is bent in a length of 30 mm as it is shown in Fig. Seal profile filler SN negative is placed on panels - Pos. Panel masks Pos. Empty places under a ridge tile are filled by compressible mineral wool Pos. Finally, a ridge tile is placed Pos. Ridge tiles are longitudinally prolonged by a plumbing joint or overlap of min. Ridge tile should be fixed on each second panel fold by screws 6.

Trimoterm SNV panels are placed from the side conditioned by the panel drain. In case snow guards are mounted on the building, fixing in the end purlin is performed through a snow guard Pos. Sheet metal in the drain should be additionally bent at an angle of in a length of mm Fig. External panel mask Pos.

In Trimoterm SNV panel, gutter handles are placed in the filling material under the top. They are fixed on the top sheet metal by two screws. Spherical caps are used for screwing. While arranging handles special attention should be paid to their length since they assure gutter inclination. Gutter Pos. Place between a faade panel and roof panel Trimoterm SNV is filled by mineral wool of low specific weight Pos. Inner mask Pos. Sequence of mounting: First the inner mask of the neck gutter Pos.

Seal made of foamed polyethylene or foamed PVC dim. Load-bearing handles of the gutter Pos. Correct arrangement assures adequate inclination that is required for water discharge. Mineral wool is placed on the mask of the neck gutter Pos. Trimoterm SNV panels are placed from the side, conditioned by the panel drain. Panels are fixed into load-bearing purlins over spherical caps.

From the bottom side masks Pos. Vertical and horizontal placing of Trimoterm FTV panels is possible. In case of a horizontal faade the panels should be correctly turned so that water draining is possible Fig. Minimal width of panel placing on intermediate supports is 60 mm and 40 mm on end supports Fig. There is mineral wool on longitudinal sides of panels that is protected by self-adhesive tape Fig. The tape need not be removed before mounting. On the top and bottom sides there is a protective foil on Fig.

The foil should be removed from the rear side before mounting of an individual panel. The foil on the front side is to be removed immediately before the work is concluded. Where it is necessary the foil can be removed already during mounting for example on a longitudinal joint of two panels, under screws, flashing When panels are stored in the open air, they should be protected against the sun, since the removal of the foil can be difficult.

In case panels are cut during mounting the use of scissors and saws is permitted since they do not heat the spot cut to a high temperature Fig. Therefore, the use of various grinding machines is prohibited for this purpose! All small metal particles that appear as a consequence of cutting and drilling should be immediately removed from panel surfaces, but in the worst case when day's work has been finished. Marking and scratching by wire nails or any similar sharp objects that might damage the protective paint coating are strictly prohibited.

Panel transfer Mounting begins in the end axis of an individual faade. Before panels are mounted it should be checked if the geometry of sub-construction is correct since it is a precondition for quality performance. In case of geometrical irregularities, they should be eliminated by suitable cutting of initial and end panels. The panels are leant on a fundamental angle block that partly transfers vertical loading. Vacuum grippers are recommended for lifting and arrangement of panels on the place of mounting in case of a vertical faade Fig.

On places where vacuum grippers suck a panel, the protective foil should be removed before the panel is lifted. Mechanical grippers can be also used for vertical faades Fig. Dimensions of grippers and pins should be determined statically with respect to thickness and weight of panels. Drilling holes for pins are made on places that are later on covered by flashing or where PVC plugs are inserted.

Two grippers are required for work with a lift. The grippers are delivered only if ordered and in scope of panel supply including instructions for work with grippers. Panel screwing Only screws made of stainless steel, with stainless steel washers of a diameter mm and EPDM seals can be used for screwing. Minimal distance from the panel edge should be considered Fig.

Selfdrilling screws of type C Fig. In case of fixing onto a steel sub-construction and use of screws of type A and type B a hole of adequate diameter should be drilled through a panel and subconstruction in accordance with the instructions of the screw producer.

Newsletter

The table presents some examples of required drilling hole sizes of the producer SFS Stadler. In case screws of type C are used, preliminary drilling of holes is not permitted. In accordance with the instructions of screw producer screw length depends on the thickness of Trimoterm panel and kind of sub-construction When tightening screws special attention should be paid since they should not be too loose or too tight. Before screws are tightened the protective foil should be removed on these places Fig. Finally the foil is removed before the work is finished or when there is no grave danger of panel damaging.

The principle of screw arrangement with respect to the number calculated is shown in Fig. Each panel should be fixed by minimally two screws on each purlin. It is recommended that a detailed calculation for an individual building is prepared by TRIMO technical department. Sealing During mounting special attention should be paid to panel squeezing. Required sealing of longitudinal joints between Trimoterm panels is discussed in detail in Section 5.

When a seal should be inserted in the longitudinal joint on the inner warm side of the faade Fig. In case butyl or silicone putty should be inserted in a longitudinal joint, it is inserted according to the method shown in Fig. Performance of some details Connection of a faade to the fundamental beam Mounting begins in the final axis of the building. Before the first panel is fixed it should be checked if the geometry of the sub-construction and faade length are correct. In case the length is by approx. Faade panel Trimoterm FTV should not protrude more than mm over the fundamental beam onto which a panel is screwed; h mm Fig.

Sequence of mounting: Fig. Before an individual panel is mounted, a cut should be made in mineral wool in a width of approx.

Pending deleted domain - April 28, - ThaiZone

The cut is required for the performance of a drain. The cut should be made by means of an adequate guide by a circular saw or a knife. In case the external sheet metal on the panel edge is more than 21 mm deep, it should be preliminarily cut. Fundamental angle block Pos. It serves as horizontal levelling. The profile Pos. It should assure vertical levelling and should be aligned with the other faade profiles.

Sealing tape is fixed on the concrete beam. It should be placed very close to the bottom fundamental profile Pos. When the first panel is mounted, a fundamental drain element Pos. The panel is placed onto a suitable place, leaning on an angle block Pos. Corner final element Sequence of mounting: First the inner corner mask is placed on faade profiles Pos. Sealing tape made of foamed polyethylene or foamed PVC 3x15 mm Pos. Requirement for sealing tape is determined in Section 5. On the first faade the panel is placed without any additional cutting.

In case Trimoterm FTV panels are fixed whose thickness exceeds mm, the second panel, inner sheet metal and mineral wool should be cut accordingly. Cutting is recommended also in case of thinner panels. The first panel is therefore screwed slightly over the level of faade profiles of the second faade. Space between the panels should be filled with well compressible mineral wool Pos. External corner mask is placed on the corner and riveted by min.

Inner corner mask is riveted in the same way. Prolongation of the mask on the external side should be performed by an overlap of min. Faade prolongation In case of higher faades a detail of faade prolongation should be performed max. Prolongation is performed on an expanded or double purlin Fig.

Sequence of mounting: First sealing tape Pos. Bottom set of faade panels Trimoterm FTV is screwed. Load-bearing angle block is riveted on the faade profile Pos. Soft mineral wool Pos. Before each top panels is mounted mineral wool should be cut in a width of approx. Cutting is required for the performance of a drain element. The cut should be made by means of a suitable guide, by a circular saw or knife.

Bitcoin BTC Technical Analysis (15 Jan 2021)

In case external sheet metal is more than 21 mm deep on the panel edge, it should be preliminarily cut. When the first external top panel is mounted, a drain element Pos. The panel with a drain element is placed on an adequate spot, leant on an angle block Pos. Special attention should be paid to a screw that should not pierce the drain.

Drain prolongation should be performed by an overlap and sealed by seal putty. Thereby, panels should be correctly placed so that water draining is possible see Fig. Advantage of horizontal lying is the fact that no additional sub-construction faade profiles is required, since basic supports could be used.

Due to the fact that sheet metal thickness of these supports usually exceeds 10 mm it is necessary to additionally weld pipes or similar profiles with thinner sheet metal Fig. Sequence of mounting: First a sealing tape Pos. Strengthening elements should be inserted Pos. For the insertion of strengthening elements a cut should be made in mineral wool under the sheet metal.

Space between the left and right panel should be filled with soft mineral wool Pos. Finally a cover flashing Pos. Preliminarily, butyl-sealing putty is fixed on the flashing.

Current DNS Records

The flashing is riveted by min. When horizontal and vertical faades are performed by Trimoterm FTV panels it should be tried hard to place screws on spots that are not visible or could be covered by plumbing elements as it is shown in Fig. Panel mask Strengthening profile Sealing tape 3 x 15 mm Thermal insulation Screw kniping Blind rivet Butyl-sealing tape 2 x 6 mm.

Fixing of horizontal faade panels by Al fixing profile Fixing by Al profile enables fast and esthetical fixing without any visible fixing elements. The panels are placed directly on the supports of load-bearing construction. Since they are usually made of sheet metal whose thickness exceeds 8 mm a pipe Pos. Before panels are finally fixed by Al profile, they are temporarily fixed by Z profile and kniping screws 6.

Z profile is inserted in a preliminarily cut made under the inner sheet metal of the panel and riveted as it is shown in Fig. Z profile is inserted on the top panel edge Fig. Before panels are mounted sealing tape 3x15 mm should be fixed on the supports.

Before Al profile is fixed an empty space should be filled with mineral wool. Front prolongation of Al profile should be performed by sealing gluing by polyurethane adhesive e. Required number of screws per m1 of Al profile is determined with respect to the static calculation or in accordance with Trimo Technical Instructions TNV Minimal width of panel support on intermediate supports is 60 mm and 40 mm on an end support Fig. There is mineral wool on longitudinal sides of panels that is protected by a self-adhesive tape Fig.

The tape need not be removed before the assembly.

Consultare solduri ITM 31.10.2012

Trimoterm SNV panels have a protective foil on the top and bottom sides in order to protect varnished surfaces against possible damage caused during transportation, handling and assembly. The foil is removed from the backside before the assembly of an individual panel. The foil on the front side is removed directly before the work is finished.


  • Xiuang! WWX.Net SWS://italymilan.accountant/Nicaragua-Managua ....
  • bitcoin schnorr bip!
  • tensorflow trading bitcoin?

On the places where this is necessary, the foil is removed already during the assembly i. If panels are stored for a longer period of time, the foil is to be removed latest after the expiry of three months.


  • Ideologies - Philosophies - PDF Free Download.
  • Xiuang! SWS://tant/Nicaragua-Managua - PDF Free Download.
  • ataturk havalimani bitcoin?

When panels are stored in the open air, they should be protected against the sun, otherwise the foil removal might be problematic. In case panels are cut during the assembly, only the use of scissors and saws is permitted since scissors and saws do not heat the place of cutting to a high temperature Fig. High temperature causes destruction of anticorrosive protection in the immediate vicinity of the place of cutting. All small metal particles that appear as a consequence of cutting and drilling are to be immediately removed, in the worst case they shall be removed from the panel surfaces when the work of the day has been finished.

Marking and use of wire nails or any other sharp objects that might damage the protective paint coating are prohibited. Panel transportation The assembly starts in the final axis of an individual faade. Before the assembly of a panel starts, the correctness of sub-construction geometry shall be checked which is a pre-condition for quality performance.